GPU Colocation In Malaysia: A Power, Cooling, And Network Checklist

Blog

GPU colocation in Malaysia means renting space, power, cooling, and connectivity for your own GPU servers inside a provider’s data centre. Before you sign, check out eight things: rack power, cooling type, the coolant loop, floor loading, redundancy, delivery date, network, and contract terms for growth.  AI racks now draw 70–107kW, according to industry experts […]

GPU Colocation In Malaysia: A Power, Cooling, And Network Checklist

GPU colocation in Malaysia means renting space, power, cooling, and connectivity for your own GPU servers inside a provider’s data centre. Before you sign, check out eight things: rack power, cooling type, the coolant loop, floor loading, redundancy, delivery date, network, and contract terms for growth. 

AI racks now draw 70–107kW, according to industry experts quoted in September. A hall designed for ordinary servers cannot host them. This checklist helps you tell the difference before the contract, not after. 

 

What Should A GPU Colocation Checklist Cover? 

Use these eight checks with every provider on your shortlist. Ask for each answer in writing. 

A GPU Colocation Checklist

 

How Much Power Will Your GPU Racks Need In Three Years? 

Plan for the rack you will run in 2029, not the one you run today. Each GPU generation has drawn more power per rack, and AI racks already reach 70–107kW. 

Ask for two numbers: what the provider can deliver to a rack today, and what the hall is designed for. If the design figure sits at today’s density, you will move halls at your next refresh. That move costs downtime and a new contract. 

Power GPU Racks Need

 

Should You Choose Liquid, Air, Or Hybrid Cooling? 

Most GPU deployments now need liquid cooling at the rack. Industry experts expect direct-to-chip liquid cooling to become standard within five to seven years. 

Hybrid halls suit mixed estates. GPU racks take liquid, while storage, and network gear stay on air. Ask which halls offer both and whether you can change the mix later. 

Liquid, Air, Or Hybrid Cooling

 

Why Do The Coolant Loop And Water Use Matter In Malaysia? 

Water is now a planning constraint. Johor has asked developers to defer water-cooled expansion until mid-2027. Analysts expect Selangor’s water headroom to stay tight from 2027 to 2029. 

The Ministry of Investment, Trade and Industry (MITI) design guideline sets a hyperscale water-use limit of WUE 2.2 m³/MWh, beside a PUE limit of 1.4. Ask how the provider’s cooling design affects both figures, and who owns the coolant distribution unit inside your cage. 

The Coolant Loop And Water Use Matter In Malaysia

 

What Does A High-Density Data Center Need Beyond Power And Cooling? 

Three things are often missed: floor loading, redundancy, and delivery dates. 

Floor loading. Liquid-cooled GPU racks weigh more than standard racks, especially when filled. Ask for the rated floor load and compare it with your rack’s filled weight. 

Redundancy on energised capacity. A redundancy level only helps if the power behind it is live. Ask how much capacity is energised today, separate from contracted or announced megawatts. 

A delivery date in writing. GPUs lose value while they wait for a hall. Put the live date in the contract, with what happens if it slips. 

 

Which Network Connections Should Be Ready For Day One? 

A GPU cluster that cannot reach its users or its data is idle in capacity. Check for at least three carriers, an internet exchange port and private cloud on-ramps in the same building. 

Cross-connects inside one campus are faster to deliver than links between sites. If your cluster serves inference to users, local peering will shorten its paths. 

 

How Should A GPU Colocation Contract Handle Growth? 

Buy a ramp, not a block. The proposed Digital Infrastructure (Data Centre) Bill could add fees for reserved capacity that goes unused. A schedule that adds racks as you deploy them keeps you clear of paying for idle power. 

Ask for three terms: a right to raise density in place, a right of first refusal on adjacent space, and a clear notice period for each step. 

A GPU Colocation Contract Handle Growth

 

How Does PE2 Measure Up Against The Checklist? 

Open DC’s PE2 campus in Bayan Lepas, Penang, has modular halls designed for up to 150kW per rack, with air and liquid cooling on one campus. About 15MW is energised. 

For more on density, read Rack density in a data centre: the AI version. For hall specifications, see the PE2 facility page. 

 

What Are The Most Common GPU Colocation Mistakes? 

1. Buying for today’s density and moving halls at the next GPU refresh. 

2. Accepting “AI-ready” without a design density and a live date in writing. 

3. Reserving a full block of power months before the racks arrive. 

4. Leaving the network until last, then waiting for cross-connects. 

5. Ignoring water: the cooling choice affects both running cost and approvals. 

Get a GPU deployment quote. Send us your GPU model, rack count, target density and live date. We will reply with a hall option and a ramp schedule. Get a GPU deployment quote → 

 

FAQs 

What is GPU colocation? GPU colocation is renting space, power, cooling, and connectivity for your own GPU servers in a provider’s data centre. You own the hardware; the provider runs the building and its power and cooling. 

How much power does a GPU rack need? AI racks in Malaysia now draw 70–107kW, according to industry experts quoted in September 2026. Buyers should choose halls designed above that range, such as PE2, which is designed for up to 150kW per rack. 

Do GPU racks need liquid cooling? Most high-density GPU racks need liquid cooling at the rack, and experts expect direct-to-chip cooling to become standard within five to seven years. Hybrid halls keep lower-density gear on air.

 

Empowering Southeast Asia’s Digital Future.

 

For further enquiries 

☎️:  03 8888 8188 (General Line)
📱: 012 3188 0446 (Sales)

📧: enquiry@opendc.my 

Operating Hours: Monday – Friday, 9am – 6pm

Share this on:

Related Blog

AI Nation 2030 Needs AI-Ready Halls: What An AI Data Centre In Malaysia Must Offer
18 November 2026

AI Nation 2030 Needs AI-Ready Halls: What An AI Data Centre In Malaysia Must Off...

How We Measure PUE At PE2: Method, Metering, & Design Targets
13 November 2026

How We Measure PUE At PE2: Method, Metering, & Design Targets

6GW Reserved, 1.37GW Used: Why Idle Capacity May Cost More
11 November 2026

6GW Reserved, 1.37GW Used: Why Idle Capacity May Cost More

Get in touch with us

We are always ready to help you answer your question

Call & Chat
Operating hours: 9am to 6pm. Mondays to Fridays
Headquarters
34B, Jalan Diplomatik 3/1, Presint 15, ​ ​62050 Putrajaya, ​ ​
Wilayah Persekutuan Putrajaya, ​ ​
Malaysia.
The information contained on this website is for general information purposes only. The information is provided by Open DC Sdn Bhd (1138988-T) and while we endeavour to keep the information up to date and correct as much as possible. When you visit or interact with our sites, services, applications, tools or messaging, we or our authorised service providers may use cookies, web beacons, and other similar technologies for storing information to help provide you with a better, faster and safer experience and for advertising purposes.
Copyright © Open DC Sdn Bhd (1138988-T) | All Rights Reserved. Website by Fido Design

Download GPU Colocation In Malaysia: A Power, Cooling, And Network Checklist Brochure

Please fill in your details to download.
Download Brochure
Open DC Sdn Bhd
Data Centres
Central
Cyberjaya
Northern
Penang
Kedah
Southern
Johor Bahru

Copyright © Open DC Sdn Bhd (1138988-T) | All Rights Reserved.