An AI data centre in Malaysia is AI-ready only if it passes five tests: rack power, liquid cooling, floor loading, power redundancy and network. Budget 2027 has made those tests urgent, because Malaysia now has a stated goal to become an AI Nation by 2030. Budget 2027 was tabled on 9 October. Two days later, […]
An AI data centre in Malaysia is AI-ready only if it passes five tests: rack power, liquid cooling, floor loading, power redundancy and network. Budget 2027 has made those tests urgent, because Malaysia now has a stated goal to become an AI Nation by 2030.
Budget 2027 was tabled on 9 October. Two days later, the Ministry of Digital set a target of 200,000 AI-skilled people as part of that goal. The government also plans a sovereign AI cloud to keep national data under Malaysian control, although no allocation was announced.
Three things moved in October. Each one changes how an AI tenant should shortlist capacity.
Demand now has a date. Aolani, a Singapore-founded AI cloud provider, signed letters of intent for 500MW of Tier III AI capacity across Malaysian sites from the second half of 2027.
Computing is becoming shared. A National AI Compute Exchange is planned for the first quarter of 2027, to give start-ups and small firms an affordable compute. Shared compute needs halls that host dense GPU clusters and connect them to many users.
The rules reward proof. The proposed Digital Infrastructure (Data Centre) Bill could add fees for reserved capacity that goes unused. A tenant who reserves power for racks that are not yet built could end up paying for it.

An AI-ready hall runs today’s GPU racks, and next year’s, without a rebuild. Industry experts quoted in September put AI rack densities at 70–107kW. The same experts expect direct-to-chip liquid cooling to become standard within five to seven years.
We use five tests. Ask every provider to answer each one in writing.


Density is rising faster than most halls were designed for. Neoclouds want capacity from 2H 2027, and the sovereign AI cloud and the compute exchange add public-sector and small-business demand. Each of these buyers needs dense racks connected to many networks.
Space that is ready is scarce. Johor colocation vacancy was 0.7% in the first half of 2026. Buyers who need AI capacity in late 2027 should compare energised, designed, and announced capacity now.

AI-ready should be checkable on a spec sheet before you sign. PE2 in Bayan Lepas, Penang, has modular halls designed for up to 150kW per rack, with air and liquid cooling on one campus. About 15MW is energised, and the first 30MW phase is about 80% committed.
In October, Weng said the new Penang fund signals growing demand for the digital infrastructure local industries depend on. He added that PE2 is scaling in phases toward 100MW, sized to committed customer demand.

1. What density can you deliver per rack today, and by what date can you deliver the design density?
2. Which cooling options are live, and which are planned?
3. How much capacity is energised now, compared with contracted or announced?
4. How could the proposed Data Centre Bill’s reserved-capacity fees affect my contract?
5. Which carriers, exchanges and cloud on-ramps can my rack reach on day one?
For a deeper look at density, read Rack density in a data centre: the AI version. For PE2’s halls and services, see the PE2 facility page.
Reserve AI capacity at PE2. Tell us your rack count, density and target date. We will reply with what is energised today and what is designed. Reserve AI capacity at PE2 →
What is an AI-ready data centre? An AI-ready data centre can power and cool GPU racks of 70kW or more, carry their weight, keep them running through a power fault and connect them to users and clouds. Buyers in Malaysia should check all five points in writing.
How much power does an AI rack use? AI rack densities in Malaysia are rising to 70–107kW, according to industry experts quoted by The Edge Malaysia in September 2026. Open DC’s PE2 halls in Penang are designed for up to 150kW per rack.
What is Malaysia’s AI Nation 2030 goal? AI Nation 2030 is the government’s goal, backed in Budget 2027, for Malaysia to become an AI nation by 2030. The Ministry of Digital’s plan includes a target of 200,000 AI-skilled people.
Empowering Southeast Asia’s Digital Future.
For further enquiries
☎️: 03 8888 8188 (General Line)
📱: 012 3188 0446 (Sales)
Operating Hours: Monday – Friday, 9am – 6pm
Copyright © Open DC Sdn Bhd (1138988-T) | All Rights Reserved.