150kW A Rack: Inside PE2, A Liquid Cooling Data Centre In Malaysia

Blog

PE2’s modular AI halls in Bayan Lepas, Penang, are designed for up to 150kW per rack, with air and liquid cooling on one campus. That leaves headroom above the 70–107kW today’s AI racks draw.  This post explains what that number means, how the halls are built to deliver it and what a tenant gets.  What […]

150kW A Rack: Inside PE2, A Liquid Cooling Data Centre In Malaysia

PE2’s modular AI halls in Bayan Lepas, Penang, are designed for up to 150kW per rack, with air and liquid cooling on one campus. That leaves headroom above the 70–107kW today’s AI racks draw. 

This post explains what that number means, how the halls are built to deliver it and what a tenant gets. 

What Does “150kW A Rack” Mean? 

It means the hall’s power and cooling are planned to deliver up to 150kW to a single rack. Industry experts put today’s AI racks at 70–107kW. 

The gap is the headroom. A tenant can install today’s GPU racks and still fit the next generation in the same position, without moving halls. 

Scale showing today's AI racks at 70 to 107kW against PE2's design density of 150kW per rack.

How Does PE2 Cool A High-Density Rack? 

At AI densities, most heat leaves through liquid. In a typical direct-to-chip design, coolant runs cold plates on the chips, carries the heat away and returns cooled, while air removes what remains. 

Direct-to-chip liquid cooling loop with coolant carrying heat from the chip to a coolant distribution unit.

PE2 offers air and liquid cooling on one campus. Lower-density storage and network gear can stay on air beside liquid-cooled GPU racks. 

Can Each Tenant Choose Its Cooling? 

Yes. Each deployment chooses the cooling that fits its racks. 

Option  Suits  Density per rack  What the tenant provides 
Air  Storage, network and general compute  Lower density  Standard racks 
Liquid  GPU training and inference clusters  Up to 150kW (design)  Liquid-ready servers 
Hybrid  Mixed estates in one cage  Planned per row  Both, planned per row 

How Does Power Reach A 150kW Rack? 

Power runs from the utility intake through switchgear, uninterruptible power supplies, and distribution to the rack. Every step is sized for the hall’s design density, not today’s average rack. 

Power path from the utility intake through switchgear, UPS and distribution to a rack.

About 15MW is energised at PE2 today. We report energised capacity separately from targets, because energised power is what a tenant can use. 

Why Build A High-Density Data Center In A Converted Factory? 

PE2 is a converted factory on industrial estate. Weng attributed the choice to scarce land in Bayan Lepas, the heart of Penang’s electronics and semiconductor cluster. 

Open DC PE2 in Bayan Lepas, a converted factory, and one of its data halls.

Reusing an existing industrial building puts capacity next to the manufacturers and engineers who use it. It also connects to Penang IX (PIX) powered by DE-CIX on the same campus. 

What Does A Tenant Get, And When? 

The campus target has been raised to 100MW from 30MW, built in phases sized to committed demand. 

Ask us for current availability and lead times by hall and cooling type. 

What Comes Next? 

We will report PE2’s energised capacity, commitment and design density in our quarterly fact sheet, in the same format each quarter. For the full buyer checklist, read GPU colocation in Malaysia: a power, cooling and network checklist. 

Book a PE2 tour. See the halls, the cooling plant, and the Penang IX node on one visit. Book a PE2 tour → · PE2 facility page 

FAQs 

What does “150kW per rack” mean? It means the hall’s power and cooling are planned to deliver up to 150kW to one rack.

Does PE2 offer liquid cooling? Yes. PE2 offers air and liquid cooling on one campus, so GPU racks can use liquid cooling while lower-density gear stays on air. 

Where is Open DC PE2? PE2 is in Bayan Lepas, Penang, in Northern Malaysia. It is a converted factory on an industrial estate and hosts Penang IX powered by DE-CIX. 

 

Empowering Southeast Asia’s Digital Future.

 

For further enquiries 

☎️:  03 8888 8188 (General Line)
📱: 012 3188 0446 (Sales)

📧: enquiry@opendc.my 

Operating Hours: Monday – Friday, 9am – 6pm

Share this on:

Related Blog

GPU Colocation In Malaysia: A Power, Cooling, And Network Checklist
24 November 2026

GPU Colocation In Malaysia: A Power, Cooling, And Network Checklist

AI Nation 2030 Needs AI-Ready Halls: What An AI Data Centre In Malaysia Must Offer
18 November 2026

AI Nation 2030 Needs AI-Ready Halls: What An AI Data Centre In Malaysia Must Off...

How We Measure PUE At PE2: Method, Metering, & Design Targets
13 November 2026

How We Measure PUE At PE2: Method, Metering, & Design Targets

Get in touch with us

We are always ready to help you answer your question

Call & Chat
Operating hours: 9am to 6pm. Mondays to Fridays
Headquarters
34B, Jalan Diplomatik 3/1, Presint 15, ​ ​62050 Putrajaya, ​ ​
Wilayah Persekutuan Putrajaya, ​ ​
Malaysia.
The information contained on this website is for general information purposes only. The information is provided by Open DC Sdn Bhd (1138988-T) and while we endeavour to keep the information up to date and correct as much as possible. When you visit or interact with our sites, services, applications, tools or messaging, we or our authorised service providers may use cookies, web beacons, and other similar technologies for storing information to help provide you with a better, faster and safer experience and for advertising purposes.
Copyright © Open DC Sdn Bhd (1138988-T) | All Rights Reserved. Website by Fido Design

Download 150kW A Rack: Inside PE2, A Liquid Cooling Data Centre In Malaysia Brochure

Please fill in your details to download.
Download Brochure
Open DC Sdn Bhd
Data Centres
Central
Cyberjaya
Northern
Penang
Kedah
Southern
Johor Bahru

Copyright © Open DC Sdn Bhd (1138988-T) | All Rights Reserved.